mirror of
https://github.com/github/awesome-copilot.git
synced 2026-09-18 04:35:31 +00:00
2.9 KiB
2.9 KiB
name, description
| name | description |
|---|---|
| gem-devops-guidelines | Design or review infrastructure, deployment, CI/CD, Docker, Kubernetes, health checks, rollback, feature flags, production readiness, and mobile release workflows. Use for DevOps, platform, container, pipeline, or release tasks. |
DevOps Guidelines
Apply only sections relevant to workload/provider/environment/acceptance criteria. Skip Docker, Kubernetes, mobile, production, rollback, health, feature-flag, security checks when not applicable.
Deployment strategy
- Rolling (default): gradual, zero-downtime replacement.
- Blue-green: duplicate environments, atomic cutover, instant rollback, 2× infra.
- Canary: route small % first; requires traffic splitting.
Docker
- Pin base-image tags (
node:22-alpine); NEVER:latest. - Multi-stage builds + non-root user. Copy deps first for caching.
.dockerignore:node_modules,.git, tests. DefineHEALTHCHECK+ resource limits.
Kubernetes
Configure startup, readiness, liveness probes with workload-appropriate initial delays/thresholds.
CI/CD
- PR: lint -> typecheck -> unit -> integration -> preview.
- Main: build -> staging -> smoke -> production.
Health and shutdown
- Simple:
GET /health->{ "status": "ok" }. - Detailed: dependencies, uptime, version.
- Services MUST expose meaningful health + gracefully handle
SIGTERMwhen workload requires it.
Configuration
Use environment variables (Twelve-Factor), separated by environment. Validate at startup + fail fast. NEVER commit secrets or hard-code NODE_ENV=production.
Rollback
- Kubernetes:
kubectl rollout undo. - Vercel:
vercel rollback. - Docker: redeploy previous pinned image.
Feature Flags
- Lifecycle: create -> enable -> 5% -> 25% -> 50% -> 100% -> remove flag + dead code.
- Every flag MUST have owner, expiration, rollback trigger. Remove within two weeks.
Checklists
- Pre-deploy: passing tests, code review, env vars, migrations, rollback plan.
- Post-deploy: healthy, monitored, old pods terminated, outcome documented.
- Production: passing tests; no hardcoded secrets; JSON logs; meaningful health; pinned versions; validated env vars; resource limits; TLS; CVE scan; CORS; rate limiting; CSP/HSTS/X-Frame-Options; tested rollback; runbook; on-call.
- Apply security/CVE checks to executable or security-sensitive workloads.
Mobile Deployment
- EAS:
eas build:configure;eas build -p ios|android --profile preview;eas update --branch production;--auto-submit. - Fastlane: iOS
match/cert/sigh/pilot; Android Gradle/supply. - Credentials in env/secret storage, never Git. Automate iOS signing with
fastlane match; usekeytool+ Google Play App Signing for Android. - TestFlight: internal instant; external 90 days/100 testers. Google Play: internal/beta/production. Expect 1–7 days review.
- Rollback: EAS
eas update:rollback; native release -> revert build; store release -> reduce phased rollout.