Files
awesome-copilot/plugins/gem-team/skills/gem-devops-guidelines/SKILL.md
T
github-actions[bot] 1404c4d678 chore: publish from main
2026-08-25 04:36:41 +00:00

3.1 KiB
Raw Blame History

name, description
name description
gem-devops-guidelines Design or review infrastructure, deployment, CI/CD, Docker, Kubernetes, health checks, rollback, feature flags, production readiness, and mobile release workflows. Use for DevOps, platform, container, pipeline, or release tasks.

DevOps Guidelines

Apply only the sections relevant to the workload, provider, environment, and acceptance criteria. Skip Docker, Kubernetes, mobile, production, rollback, health, feature-flag, and security checks when they do not apply.

Deployment strategy

  • Rolling (default): gradual, zero-downtime replacement.
  • Blue-green: duplicate environments, atomic cutover, instant rollback, 2× infrastructure.
  • Canary: route a small percentage first; requires traffic splitting.

Docker

  • Pin specific base-image tags (for example node:22-alpine); NEVER use :latest.
  • Use multi-stage builds and a non-root user. Copy dependencies first for caching.
  • .dockerignore: node_modules, .git, tests. Define HEALTHCHECK and resource limits.

Kubernetes

Configure startup, readiness, and liveness probes with workload-appropriate initial delays and thresholds.

CI/CD

  • PR: lint -> typecheck -> unit -> integration -> preview.
  • Main: build -> staging -> smoke -> production.

Health and shutdown

  • Simple: GET /health -> { "status": "ok" }.
  • Detailed: dependencies, uptime, version.
  • Services MUST expose meaningful health and gracefully handle SIGTERM when the workload requires it.

Configuration

Use environment variables (Twelve-Factor), separated by environment. Validate at startup and fail fast. NEVER commit secrets or hard-code NODE_ENV=production.

Rollback

Kubernetes: kubectl rollout undo. Vercel: vercel rollback. Docker: redeploy the previous pinned image.

Feature Flags

  • Lifecycle: create -> enable -> 5% -> 25% -> 50% -> 100% -> remove flag and dead code.
  • Every flag MUST have an owner, expiration, and rollback trigger. Remove within two weeks.

Checklists

  • Pre-deploy, when applicable: passing tests, code review, environment variables, migrations, rollback plan.
  • Post-deploy services: healthy, monitored, old pods terminated, outcome documented.
  • Production services: passing tests; no hardcoded secrets; JSON logs; meaningful health; pinned versions; validated environment variables; resource limits; TLS; CVE scan; CORS; rate limiting; CSP/HSTS/X-Frame-Options; tested rollback; runbook; on-call.
  • Apply security/CVE checks to executable or security-sensitive workloads.

Mobile Deployment

  • EAS: eas build:configure; eas build -p ios|android --profile preview; eas update --branch production; --auto-submit.
  • Fastlane: iOS match/cert/sigh/pilot; Android Gradle/supply.
  • Keep credentials in environment/secret storage, never Git. Automate iOS development/distribution signing with fastlane match; use keytool and Google Play App Signing for Android.
  • TestFlight: internal instant; external 90 days/100 testers. Google Play: internal/beta/production. Expect 17 days for review.
  • Rollback: EAS eas update:rollback; native release -> revert build; store release -> reduce phased rollout.