chore: publish from main

This commit is contained in:
github-actions[bot]
2026-08-17 05:29:04 +00:00
parent ce60087a0c
commit 6ca1f999fa
41 changed files with 1830 additions and 4180 deletions
+61
View File
@@ -0,0 +1,61 @@
---
name: gem-devops-guidelines
description: Design or review infrastructure, deployment, CI/CD, Docker, Kubernetes, health checks, rollback, feature flags, production readiness, and mobile release workflows. Use for DevOps, platform, container, pipeline, or release tasks.
---
# DevOps Guidelines
## Deployment strategy
- Rolling (default): gradual, zero-downtime replacement.
- Blue-green: duplicate environments, atomic cutover, instant rollback, 2× infrastructure.
- Canary: route a small percentage first; requires traffic splitting.
## Docker
- Pin specific base-image tags (for example `node:22-alpine`); NEVER use `:latest`.
- Use multi-stage builds and a non-root user. Copy dependencies first for caching.
- `.dockerignore`: `node_modules`, `.git`, tests. Define `HEALTHCHECK` and resource limits.
## Kubernetes
Configure startup, readiness, and liveness probes with workload-appropriate initial delays and thresholds.
## CI/CD
- PR: lint → typecheck → unit → integration → preview.
- Main: build → staging → smoke → production.
## Health and shutdown
- Simple: `GET /health``{ "status": "ok" }`.
- Detailed: dependencies, uptime, version.
- Services MUST expose meaningful health and gracefully handle `SIGTERM` when the workload requires it.
## Configuration
Use environment variables (Twelve-Factor), separated by environment. Validate at startup and fail fast. NEVER commit secrets or hard-code `NODE_ENV=production`.
## Rollback
Kubernetes: `kubectl rollout undo`. Vercel: `vercel rollback`. Docker: redeploy the previous pinned image.
## Feature Flags
- Lifecycle: create → enable → 5% → 25% → 50% → 100% → remove flag and dead code.
- Every flag MUST have an owner, expiration, and rollback trigger. Remove within two weeks.
## Checklists
- Pre-deploy, when applicable: passing tests, code review, environment variables, migrations, rollback plan.
- Post-deploy services: healthy, monitored, old pods terminated, outcome documented.
- Production services: passing tests; no hardcoded secrets; JSON logs; meaningful health; pinned versions; validated environment variables; resource limits; TLS; CVE scan; CORS; rate limiting; CSP/HSTS/X-Frame-Options; tested rollback; runbook; on-call.
- Apply security/CVE checks to executable or security-sensitive workloads.
## Mobile Deployment
- EAS: `eas build:configure`; `eas build -p ios|android --profile preview`; `eas update --branch production`; `--auto-submit`.
- Fastlane: iOS `match`/`cert`/`sigh`/`pilot`; Android Gradle/`supply`.
- Keep credentials in environment/secret storage, never Git. Automate iOS development/distribution signing with `fastlane match`; use `keytool` and Google Play App Signing for Android.
- TestFlight: internal instant; external 90 days/100 testers. Google Play: internal/beta/production. Expect 17 days for review.
- Rollback: EAS `eas update:rollback`; native release → revert build; store release → reduce phased rollout.